Before the process engineering, the space frame manufacturer will process the parts of the accessories.
After the coating of the accessory surface is dry, the space frame is checked in detail after drying the coating of the accessories. The surface coating of the packaging protection component is a complete drying state, ensuring that the components and parts are not deformed, damaged, and no loss.
The names, numbers, weights, and hanging points of the space frame of the space frame packaging, the name, number, weight, and hanging point position, etc., and fill in the packaging list.
In the installation order of the process attachment, the space frame structure accessories is assembled according to the unit, and the configuration is complete and re -supply. The stacking venue on the spot can meet the needs of the on -site installation order.
During the transportation of space frame accessories, the length and weight of the space frame craft accessories are combined with the appropriate transportation vehicles. The fulcrum of the space frame accessories on the transport vehicle, the length of the two ends, and the method of ligation must ensure that the space frame accessories do not produce deformation and not damage the coating.
The daily storage requirements of the craft accessories of the space frame to ensure that the ground floor is flat and firm. Divide and store according to the type, model, and installation order of the components; the bottom cushion should have sufficient support surface to prevent the fulcrum from sinking. When the same type of space frame accessories are stacked, the fulcrum of each layer of the space frame accessories should be kept on the same vertical line to prevent the space frame accessories from being fractured and deformed.
After the craft accessories to the construction site, the relevant personnel should check the details of the accessories, check the number of accessories entry accessories, and check the factory certificate and related information.