A modern space frame processing plant is a necessity for engineering construction

The modern construction industry needs advanced engineering technology to support, and space frame engineering construction has become an indispensable part of it. The construction of space frame engineering requires professional teams and facilities, and a modern space frame processing plant has naturally become an indispensable condition. This article aims to introduce the characteristics, technology and necessity of engineering construction of a modern space frame processing plant.

1. Features of modern space frame processing plants

Modern space frame processing plants usually use CAD software for design and drawing, and advanced machinery and equipment achieve fast and accurate processing, such as CNC bending machines, CNC shearing machines, CNC cutting machines, CNC punching machines, etc. Among them, the addition of numerical control equipment has greatly improved production efficiency and product quality, and improved the industry competitiveness of products. In addition, modern space frame processing plants are equipped with professional inspection equipment, such as three-coordinate measuring machines, to ensure the quality of products.

2. Necessity of Space Frame Engineering Construction

The purpose of space frame engineering construction is to ensure the stability and safety of the building. Today, the environment and conditions that the construction industry is facing are becoming more complex and uncertain, so more sophisticated, efficient and safe space frame engineering construction is required.

Improve construction efficiency

The traditional construction mode requires construction workers to make and process it manually, which has problems such as low accuracy, heavy workload, and low efficiency. The modern space frame processing plant uses CAD software for modeling and CNC machine equipment for production, which greatly improves construction efficiency.

improve product quality

Using advanced design and production software, compared with traditional manual operations, CNC machines reduce errors compared with manual processing, and can produce more standardized and accurate space frame products. In addition, the quality control and management of products are also more stringent, such as checking and testing the full size and bearing performance of nodes and reinforcements of large space frames.

better security

There are often some potential safety hazards at the construction site, such as workers working at heights, lifting and hanging objects, and other issues. The space frame products produced by the modern space frame processing plant put all the work on the safe ground, thereby reducing the number of high-altitude operations and reducing the risk of workers.

3. Construction technology of space frame engineering

The construction of space frame engineering is divided into three stages: design preparation, processing and manufacturing, and assembly construction:

Design preparation stage: Carry out space certification, analysis of terrain and landform, analysis of meteorological, climate and other environmental factors, determine the construction site, draw construction drawings, and conduct simulation and verification.

Processing and manufacturing stage: process the space frame structure according to the design drawings, and use numerical control equipment for high-precision processing.

Assembling and construction stage: The space frame is installed and assembled on site, hoisted and positioned by machinery, and the installation of the space frame structure is completed.

Four. Conclusion

The modern space frame processing plant is gradually becoming the standard equipment in the construction industry. It is characterized by standardization, specialization, and automation. The design, production, inspection, and delivery links are all subject to corresponding quality control. Modern space frame processing plants play an important role in the construction of space frame projects, and are of great significance to improving the efficiency and safety of network construction.

Steel structure space frame dome installation steps

The installation process of a steel structure space frame dome involves several sequential steps. Here's an outline of the typical installation process:



1. Site Preparation:
- Clear the construction site of any debris or obstacles.
- Verify that the foundation is ready and meets design specifications.

2. Material Delivery and Inspection:
- Receive and inspect steel components, connectors, and other materials for quality and accuracy.

3. Scaffold Setup:
- Erect scaffolding or temporary support structures around the dome's perimeter to facilitate construction.

4. Component Assembly:
- Assemble the steel framework components off-site or on-site as needed.
- Weld or bolt together columns, beams, and connectors following the approved design and specifications.

5. Lifting and Positioning:
- Use cranes or lifting equipment to position and lift assembled framework components into place.
- Ensure precise alignment with the foundation and other components.

6. Connection and Welding:
- Securely connect framework components using welding, bolting, or other approved methods.
- Verify the strength and stability of connections.

7. Truss Installation:
- Install trusses or bracing elements that provide additional support and stability to the dome's structure.

8. Roofing and Cladding:
- Attach roofing and cladding materials to the steel framework to create the dome's outer skin.
- Ensure proper waterproofing and insulation as required.

9. Interior Finishing:
- If applicable, complete interior finishing work such as insulation, walls, and any necessary infrastructure.

10. Quality Control:
- Perform quality checks and inspections at various stages of construction to ensure compliance with design and safety standards.

11. Testing:
- Conduct load testing and structural integrity assessments to verify the dome's stability and safety.

12. Finishing Touches:
- Apply any final coatings, paint, or finishes to the steel components.

13. Clean-Up:
- Remove scaffolding and temporary support structures.
- Clean the construction site of debris and waste.

14. Final Inspection and Handover:
- Conduct a thorough inspection of the completed dome to ensure it meets all requirements.
- Obtain necessary approvals and permits.
- Hand over the completed dome to the owner or operator.

Remember that the installation steps might vary based on the specific design, size, and complexity of the steel structure spatial framework dome. It's crucial to collaborate closely with experienced engineers, architects, and construction professionals to ensure a successful and safe installation process.

Space Frame Engineering: A Bridge Between Heaven and Earth

With the development of the city and the advancement of modernization, the height of buildings gradually increases, and the distance between buildings also expands. However, the traditional combination of individual buildings can no longer meet the development needs of urban economy, population and culture. Therefore, a new architectural concept—space frame engineering emerged as the times require and has become an important part of modern urban architecture.

Space frame engineering first originated from ancient bridge construction. Traditional bridges are composed of independent piers, bridge arches and other supporting structures. The space frame is to build a variety of grid-like support frames between buildings to form multiple buildings into an interconnected and interrelated whole, thus forming a large-scale building complex with multiple functions.

One of the characteristics of space frame engineering is spatial connectivity and visual coherence. Architects and engineers usually design various efficient grid and frame structures between buildings. These support structures form a seamless connection between buildings, making the buildings visually look like a whole, thus creating a spatial connectivity and visual coherence.

In the construction of modern cities, space frame engineering has become an indispensable part. Not only is it widely used in commercial plazas, large stadiums, cultural centers and other large building complexes, but also in some special occasions, space frame engineering has also been more and more used. For example, in the construction of transportation infrastructure such as subways and expressways, the space frame can realize the seamless connection of the road network through the expansion of time and space; in municipal public works, the space frame can provide more convenient and efficient services for all things in the city through the connection of different forms of buildings and facilities.

In addition, space frame engineering also has high economic and environmental benefits. First of all, multiple buildings are connected together through a grid-like support structure, which can save the cost of building independent buildings on the ground and infrastructure, and greatly reduce the cost of manpower, material resources and financial resources in the process of building construction; secondly, space frame engineering can make full use of the space between buildings, so that these spaces can be fully utilized, thereby improving the utilization rate of urban land; finally, space frame engineering can also resist wind, earthquake, snow and other natural disasters, making the entire building complex safer, more reliable and more durable.

Of course, compared with traditional buildings, space frame engineering has certain challenges and difficulties in the process of design, construction and maintenance. First of all, the space and height of different buildings are often very different, and a variety of engineering technologies and calculation methods are required to design appropriate support and connection structures; secondly, the construction of space frame projects involves the coordination of multiple construction units, involving the coordination of various responsibilities and rights, and requires the establishment of a set of reasonable management systems; finally, because space frame projects are located at high altitudes or in special-shaped areas, they require superb safety skills and professional team support in terms of maintenance, maintenance, inspection and renewal.

Generally speaking, the space frame engineering is a bridge connecting the sky and the earth. Its advantages lie in spatial connectivity and visual continuity, and it has an irreplaceable position in modern urban architecture. Although there are many challenges and difficulties in the process of design, construction and maintenance, with the continuous innovation of modern technology and engineering technology, the advantages and applications of space frame engineering will become more and more significant, contributing more to the development of cities and the progress of civilization.

The hoisting sequence of the space frame steel structure, crane arrangement and running route

The hoisting sequence of the space frame steel structure:

1. Juxtaposed high and low span roof hoisting: the high span must be installed first, and then the low span, which is conducive to the verticality of the high and low span steel columns.

2. Parallel large-span and small-span installation: the large-span must be installed first, and then the small-span.

3. The installation of a large number of parallel rooms and a small number of rooms: the large number of rooms should be hoisted first, and the number of small rooms should be hoisted last.

4. Component hoisting In most construction situations, the vertical components are hoisted first, and then the planar components are hoisted, that is, the comprehensive installation method is used for hoisting.

Crane arrangement and running route of space frame steel structure:

The installation site of the space frame steel structure should consider factors such as the characteristics of the project structure, site conditions, and the operating radius of the crane to plan in advance the layout position and operating route of the hoisting machinery, so as to give full play to the efficiency of the crane and ensure the orderly progress of hoisting. The figure below is a map of the crane layout and running route of a certain project, and the arrow line indicates the running route.

The hoisting sequence, crane arrangement and running route of the space frame steel structure can be determined according to the specific engineering conditions and design requirements. Please note that the above are just general suggestions. The specific hoisting sequence, crane layout and driving route need to be designed and planned in detail according to the specific engineering situation. It is recommended to operate under the guidance of engineering professionals.



Six categories of steel structure workshop design

The steel structure factory building has a large application span and a large bearing capacity. The following are the six categories of SAFS steel structure factory building design, let's learn and understand together.

Six categories of steel structure workshop design:

1. Horizontal steel structure factory building Horizontal steel structure factory building is divided into steel frame structure horizontal rail horizontal industrial factory building and steel frame structure inclined rail horizontal industrial factory building. Its inclined rail structure can make the factory more convenient and easy to clean and cut.

2. Double-span steel structure factory building The double tool holders of the double-span steel structure factory building are equipped with parallel surfaces, which can also be vertical to each other.

3. Top-level steel structure factory building The top-level steel structure factory building is equipped with a general tailstock or a steel frame structure tailstock, which is suitable for drilling long equipment and equipment with no large diameter.

4. Single-span steel structure factory buildings Steel structure workshops are generally equipped with various forms of single-span frames, such as four-station horizontal indexing lathe tool holders or multi-station vertical automatic indexing beams.

5. Chuck type brake steel structure factory building The chuck type brake steel structure factory building has no tailstock and is suitable for the entire equipment of drilling discs. The clamping methods are mostly automatic or hydraulic control, and the hydraulic chuck structure mostly has an adjustable lathe chuck or has no soft jaws.

6. Portal steel structure workshop The portal steel structure workshop is directly called the portal frame structure system. The spindle bearing of the workshop vertically bisects the horizontal plane, and passes through a large arc-shaped construction platform for clamping parts . This kind of project is mainly used for processing the large axial sense of proportion, the radial sense of proportion is relatively small, super heavy and simple whole equipment.

Problems in the design of portal steel frame structure

With the rapid development of the national economy, China's steel production has increased significantly. Welding H -shaped steel is used in large quantities, and the application of portal steel frame structure in industrial or commercial buildings is becoming more and more widely used. The SAFS steel structure discusses the problems in the design of the portal steel frame structure industrial plant through the practice and exploration of many projects, and gives corresponding solutions and suggestions on related issues.

1 Overview

With the rapid development of the economy, portal steel frame structure houses have emerged quickly in my country due to their processing system, easy installation, and fast. However, due to the late starting research on light steel structure in my country, the relevant design specifications of the "Technical Regulations for Steel Structure of Light Housing Housing Housing" in the relevant design specifications are also relatively lagging. Prior to this, you can only design the "Steel Structure Design Specifications" (GBJ17-88) and "Technical Procedures for Cold Bend Thin Wall-Wall Steel Structure" (GBJ18-87) and relevant foreign regulations. Therefore, there is a large gap with Western developed countries in terms of design level, design experience and rationality. In recent years, domestic scholars have conducted a lot of exploration and research on the design of portal frame steel structure, and have achieved fruitful results. With the implementation of the "Technical Regulations for the Steel Structure of the Steel Light House" (CECS102: 2002), the corresponding practical design software has been continuously developed. Software such as portal frame steel structure light housing design system PFCAD, steel frame light housing design CAD system PS2000, PKPM, and 3D3S developed by Tongji University can analyze and calculate the portal frame steel structure. Because the design specifications are not the same as foreign abroad, we cannot copy foreign design specifications when we design, and apply foreign design software. Therefore, it is particularly important to explore the optimization design calculation method that is in line with the domestic steel frame cross -section optimization design and reduce the construction cost of the portal frame steel structure.

In recent years, a large number of portal frame steel structure have been adopted in factory design practice. Through the practice and exploration of these projects, they have also accumulated some experience and understanding. This article discusses some problems encountered during the design of the portal frame steel structure.

2. The main problems and solutions existing in the design of the current portal frame steel structure plant

2.1 The problems and solutions existing in the structure model

In the design of light portal frame steel structure, the intermediate column is often designed as the upper and lower nodes in the form of a hinge. At this time, the middle column only plays the role of the middle support in the beam. Regardless of the bending moment, the calculation length coefficient is 1, and the cross -section is greatly reduced compared with the rigid connection. At the same time, the hinge connection structure of the column and the beam is greatly simplified compared with the rigid connection structure, and it also saves a lot of steel. If the column is high, the pillar is shifted under the influence of the wind load. The pillar's foot should be rigid, and the connection between the middle column and the beam should also be used. When the span of the beam is large, it is advisable to use a broken beam. The height of the beam should not be less than 1/35-1/40 of the span. The height of the middle section of the beam should not be less than 1/60 of the full span. The length of the cross section calculated from the end of the beam can generally be 1/5 to 1/6 of the span, and it should be coordinated with the pitch.

The anti -wind column is the main component that supports the gables in the portal frame steel structure and resist the horizontal wind load. The upper end of the anti -wind column is connected to the rigid beam, and the lower end has set the foundation separately. The design methods and structural measures of the wind column not only affect the stress characteristics of the windy column itself, but also affect the rigid shelf and basic design and force connected to it. There are two ways to connect the wind column and the foundation. When hinged, the foundation only bear a small axis and horizontal shear power. The design and structure are very simple, and the amount of engineering is small. If it is just connected, the shaft force and bending moment passed to the base are much larger. The eccentric distance is also very large, which is not conducive to basic design; therefore, the windy column should be hinged.

2.2 The problems and treatment of irregular buildings

The size of the building mainly includes the span, column distance, eaves height, and roof slope of the rigid frame. For portal frame housing steel structures, unreasonable building size often leads to a sharp rise in steel volume and increased costs. In addition, due to the flexibility of the production of steel structure components and the construction of light houses (wall) surface materials, the production and construction of portal frame steel structure houses can basically be tailored.

The "CECS102: 2002: 2002) (CECS102: 2002) (hereinafter referred to as" door -type steel frame regulations ") is recommended to use the pillar distance of 6 ~ 9m. Vertical loads (such as roof loads, hanging loads, crane loads, etc.) are the main factor affecting the pillar distance of the economic column. When the load is large, the pillar distance of the economic pillar will decrease, and the economic column distance of the load will increase. When the load conditions are the same, the economic column is not obvious by the span, that is, the economic column distance of the various span -rigid systems is basically the same. However, the larger the span, the more sensitive the amount of steel is used to the column, and the range of fluctuations is increased. The better the good economic benefits presented by the economic column distance.

The portal frame steel structure system also has economic spans, so it is not advisable to blindly pursue large spans. The main factor affecting the economic span is load. The larger the load, the more sensitive the amount of steel is used to the span. The more you should pay attention to the reasonable span. This is because the large -load -large column section is large; the economic span of the portal frame steel structure is 18-30m, the economic span is 24-30m when the tonnage of the crane is large, the tonnage without a crane or a crane is small, and the economic span is 18 21m. Therefore, the use of reasonable spans can also save steel, reduce the total cost, and economic benefits are considerable.

2.3 Solution of deformation problem

Table 3.4.2-1 from the "Portal Frame Regulations" can be found in the limit of the design value of the rigid columns. Top allows a lot of displacement. This is the difference between light steel structure and ordinary steel structure. However, among the crane factories, especially in the large tonnage crane factory building of more than 20T, when the pillar top allows deformation, the pillar height affects this factor. The absolute value of controlling its horizontal displacement is within a reasonable range to ensure the normal use of the plant.

2.4 Discussion on issues related to node design

The connection node of the portal frame steel structure beam and the rigid column, according to the "portal frame steel structure regulations", can be divided into three methods: end plate vertical, end plates, and oblique end plates. Each form can be divided into two methods: end plate flat and end plate extension. In order to reduce the thickness of the end plate, the rib should be set up between the end plate to connect the bolt, so that the support boundary form of the end plate is on both sides or three sides, thereby increasing the intensity and stiffness of the connection node. In the portal frame steel structure with cranes, its structure should conform to the principle of the beams and columns in the process of use, that is, the so -called rigid connection node. If the construction conditions permit, the beam and column nodes are best to use the bolt -welded connection node, that is, the wings are connected to the welding seam, and the web plate is connected with a high -strength bolt.

It is important to note that although the pillar and the beam are envisaged as a rigid, in fact, due to various factors, the calculation assumptions may not match the actual situation. For example, the connection between the step -shaped upper columns of the crane plant and the roof beam. Compared with the section of the beam end, the cross -section height is often smaller. Although the high -strength bolt is used to connect the node design according to the calculation of a rigid connection, it seems to be just connected, but because the cross section of the beam is far greater than the connected column section height, the two rigidity ratio is very different. The pillar rigidity is small, and the beam cannot be well -embedded, and it cannot have the ideal stiffness. This makes this node similar to the state between the fixed connection and the hinge, and the embedded solid at the end of the beam at the top of the column must be guaranteed with a sufficient stiffness of the column itself.

In addition to the connection node of the rigid beam and the rigid column, the stitching nodes of the rigid beam are selected in the small parts of the bending momentaries, and the manufacturing and transportation unit often takes 8-12m. The results of practice and experts show that the connection method of external extension and rib end plates is more reasonable. In order to reduce the difficulty of bolt arrangement during the design of the end plate, the 10.9 -level friction -type high -strength bolt should be preferred. The steel number of the bolt can also be selected with 20mntib, or No. 40 steel and 35VB steel are selected.

3. Conclusion

The portal frame steel structure houses are widely used in various buildings with large span, light weight, fast construction speed, low comprehensive economic indicators, and wide scope of application. With the extensive application, there is a certain accumulation of experience. However, there are many problems worth discussing, such as the impact of welding form on the performance of components; these problems require engineering and technical personnel and researchers to work together. The above is the summary of some design experience in the design process. I hope to get the correction of experts.

Steel structure spray technology introduction

 Nowadays, the repetitive use of steel has greatly reduced construction garbage and green and environmentally friendly. It can be said that it is widely used in industrial buildings and commercial buildings.

For traditional concrete buildings, it uses steel plates or steel to replace steel concrete, which has a higher strength and better seismic resistance. And because the component can be made in factory, it is installed on the spot. As a result, it is greatly reduced and recognized by most people. Regarding the beauty of the steel structure, the spraying method is indeed a technical work.

When using the sprayer, the iron shelf and steel structure spray are essential. First of all, we must polish the surface of the steel structure for rust removal treatment. At the same time, we must remember that the steel structure after polishing can complete the paint within 4 hours.

Basically, the polished steel structure can complete the paint in 4 hours. And many times, during use, we also need to focus on the use of ET-98 inorganic phosphate long-effect type zinc-rich coatings as primer. In most cases, it is enough to remove oil and rust, but it does not need to be polished, but use steel wire brush, polished or steel sandpaper.

It is important to note that we must first polish the surface of the steel structure. In general, in addition to debris such as rust and oxide, it is also necessary to pay more attention to its surface treatment quality control should reach the SA2.5 level specified in the "front steel surface rust level and rust level" standard specified in GB8923. And the surface roughness is 35-75um, and the sand dust is removed after polishing.

Under normal circumstances, we can use light sweep -grade grinding method to remove the gray layer with galvanized layers and have impurities such as oil pollution. During the later use, we also need to pay attention to its 70-H epoxy iron red anti-corrosion paint.

If you encounter welding parts, it is recommended not to paint within 72 hours after the candle welding.

Preparation before installation of steel structure space frame

 Preparation before installation

Before the construction of the space frame structure, all technical materials on the project should be provided in a timely manner, including: a full set of drawings, the mechanical performance test report of the space frame bolt, the mechanical performance test report of the steel pipe and the analysis report of the chemical composition of the material, the welding Certificate copy and other information. Before the installation of the space frame, the construction site should be set up on the site of the project and the life and preparation of the installation team should be set up. The processing of each component of the space frame before the space frame is completed. After the acceptance and the assembly of the small unit are completed, all enter the market.

1. Before installation, check the axis and elevation of the space frame support. The axis and elevation position of the space frame must meet the design requirements and relevant standards;

2. Check the strength of the supporting concrete before installation. The concrete strength must meet the design requirements and the current national relevant standards.

3. Put the scaffolding, and arrange the position and elevation of each fulcrum. And design the temporary fulcrum, the location and quantity of the temporary fulcrum are determined;

4. Temporary fulcrum is selected to gradually adjust the height of the space frame.



Precautions for bolt connection during steel structure building construction

      The quality of steel structure construction is related to the safety of the construction of the building afterwards, so the quality control of each construction link is very important. So what do you need to pay attention to for steel structure bolt connection? The following is introduced by SAFS Steel Structure Company.

The bolt connection is the key task of the quality control of the steel structure. We need to check each bolt after tightening to prevent the phenomenon of leakage. For those phenomena that are not tightened or twisting, we must re -tighten or replace bolts.

1. Do not use gas cutting

The bolts in the steel structure building are usually used in ordinary bolts and high -strength bolts. The connection of ordinary bolts must not be padded with more than two spacers at each end of each bolt. And if the bolts are misplaced, they cannot be expanded with gas cutting, and they must be used to use a knife or re-cutter.

2. High-strong bolt quality control

After the bolt is tightened, the exposed thread must not be less than 2 to 3 thread distance. The control of high -strength bolts is the connection of the bolt, the treatment of the friction surface, and the frictional surface anti -slip coefficient. The initial twist and final twist of the bolt connection, and the torque value, the surface of the node is damaged and deformed.

3. Installation of high -strength bolts

During the installation process of the high -strength bolt of the steel structure, the contact surface must be flat, and the area of contact must be greater than 75%, and the gap of the edges must not be greater than 0.8 mm. The high -strength bolt cannot be used as a temporary installation, and the tightness of the bolt should be performed in one direction. The bolts installed every day must complete the final tightening work and check them one by one to prevent leakage.

Different steel structures have different fire protection measures

1. Expansive material

The steel structure fireproof coating is used to protect the components. This method has the advantages of good fireproof and heat insulation performance, and the construction is not limited by the geometric shape of the steel structure. Belongs to modern advanced fire prevention technical measures.

 

2. Outer cladding

It is to add an outer cladding on the surface of the steel structure, which can be cast-in-place or sprayed. The solid concrete outer cladding of steel structure fire-proof cast-in-place is usually reinforced with steel wire mesh or steel bars to limit shrinkage cracks and ensure the strength of the shell. Spraying method can apply sand pump to the surface of the steel structure at the construction site to form a protective layer. The sand pump can be lime cement or gypsum mortar, or it can be mixed with perlite or asbestos. At the same time, the outer cladding can also be made of perlite, asbestos, gypsum or asbestos cement, and light concrete to make prefabricated panels, which are fixed on the steel structure with adhesives, nails, and bolts.

 

3. Shield

The steel structure is set in the wall or ceiling composed of refractory materials, or the components are enclosed in the gap between two walls, and the purpose of fire prevention can be achieved only by adding a little or no refractory materials. This is one of the most economical fire prevention methods.

 

4. Fill with water

Filling the hollow steel structure with water is the most effective protection measure for steel structure fire prevention. This method keeps the steel structure cool during a fire, and water circulates within the steel structure, absorbing heat from the material itself being heated. The heated water can be recirculated after being cooled, or cool water can be piped in to replace the heated water.

Two major methods of beam-column connections in steel structure buildings

Steel structure engineering is one of the main types of building structures, commonly used in modern construction projects. Steel's cha...