The top chord assembly and electric welding of steel structure space frame work steps:
1.Put in the longitudinal bars of the upper chord plan space frame to check whether the longitudinal parts and specifications of the top chord ball are appropriate.
2.Put in the transverse bars of the top chord plan space frame to check whether the longitudinal parts and specifications of the top chord ball are appropriate.
3. According to the proper adjustment of the diagonal web member of the three-dimensional small assembly module, the longitudinal and transverse bars of the top chord and the electric welding ball are properly in place. The way to adjust the oblique web members to not only laser cut too long bars, but also to open the angle of view of the transverse bars with inverted chains, so that the rods are properly in place. Ensure the proper size of the top chord grid.
4. Adjust the gaps, and weld the upper chord members after the gap foundation reaches the standard.
5. After the upper chord is fixed, weld the lower chord ball and the transverse bar to make the connection strong.
6. Check space frame specifications and push forward gradually.
The installation of web member and upper chord should be carried out in coordination with each other.
7.After the completion of the installation of the space frame pavement, the project acceptance shall be carried out according to the general specifications of the strips or blocks for the installation of the space frame.
8. The space frame to be hoisted must be hoisted (lifted) after the welding process is finished, the welding appearance quality and the welding ultrasonic flaw detector are reported to reach the standard.