How to control the quality of bolted connection construction of steel structure engineering? The high-strength bolt connection project is also one of the most important sub-items of steel structure engineering, and it is also one of the weak links in the current construction quality, mainly in:
steel structure engineering:https://www.safsteelstructure.com
(l) Some high-strength bolts are shoddy (replace high-strength bolts with ordinary refined bolts);
(2) The surface treatment of high-strength bolts does not meet the requirements of the specification, including surface treatment, leveling and closeness, and quality of bolt holes;
(3) The tightening of high-strength bolts is not carried out according to the specifications. For example, the initial tightening and final tightening are completed at one time, no torque wrench is required, and it is entirely based on subjective estimates.
In order to ensure the construction quality of the high-strength bolted connection project, the supervising engineer must have a high sense of responsibility. While urging contractors to improve quality awareness, strengthen quality management, and implement quality assurance measures, work methods such as side-by-side supervision and parallel inspection are actively adopted. Only in this way can the construction quality of the high-strength bolted connection project be under strict control.
没有评论:
发表评论